LINK 20 INSTALL IP27
Monday - June 16, 2003•Views: 6733••
A Link 20 monitor is shown installed. The control unit is shown surface mounted near the stairs. The link cable feeds directly into the engine/battery compartment behind the unit. A panel is shown installed on the forward wall of the battery compartment which allows for mounting of the Link shunt (lower left) and high amperage fuses for the house and start banks. All positive and negative feeds are connected here.