Holding tank and hose replacement
Tuesday - May 23, 2006•Views: 6930••
Everything is new from the thruhull to the heads, including the heads. Macerator T'd into deck pumpout hose. I epoxied a board in to mount the macerator and mounted it on a rubber sheet to try and minimize the noise. I'll cover it with some leftover soundproofing material next. I also epoxied in a block of wood right next to the tank with an eyebolt in it. Padlock secures the valve closed, which I hope will satisfy the potty police. Hoses sealed with Loctite 515, a trick left over from working with hydraulics. It'll seal anything. Hardest part was removing old hoses because they were stiff, new ones bent and installed pretty easily. Glad that job is done!